Salt Spray Test Chamber, Corrosion Test Chamber, ASTM B117, Fog spray cabinet 270L

Salt-spray-chamber-corrosion-astm-b117-fog-spray3

Salt spray test chamber,corrosion test chamber,it can perform corrosion test as per standard ASTM B117,ISO9227.A surface finishing corrosion test equipment.

Internal capacity:413L

Model no.: L-SP series

Temperature range:RT+10℃ ~55℃

Controller:Single-point temperature controller, precise PID control

Unique structure and design, with good temperature uniformity

Specifications for Salt Spray Test Chamber, Corrosion Test Chamber, 270L

Model L-SP-413
Interior capacity(L) 413
Temperature range +35℃~+55℃
Temp fluct / deviation ±0.5℃ /  ≤+2℃
Spray volume Adjustable from 1~2ml/80cm2.h
Spray method Tower type or baffle type
Adjustment method Continuously, intermittent spray type is adjustable
Top tower angles 110~120°
Saturator tank temperature +35℃~+60℃
Internal Di D*W*H 750*110*500
Exterior di  D*W*H 950*1700*1310
Control method Balanced Temperature Control Method
Enclosure High grade PVC, or PPR material
Cover Transparent hard PVC plastic plate
Controller High accuracy digital temperature controller
Heater Special designed
Controller Single point digital controller
Running method Fix running
Setting method Button push setting
display resolution Temp:0.1℃,Time:0.1min
Power supply AC220(±10%)V Single phase + E, 50Hz
Standard accessories Power supply cable 1pc,Fog collection measuring cylinder 2pcs,Atomizing nozzle 1pc,Specimen rack  1set ,Specimen hanger rod 1set
Security accessories Leakage breaker, Interior over heat protector,Saturator over heat protector, Water short protector
Comply standards GB/T2423.17-93、GB10587-89、GJB150.11-86、GJB1063、ICE、MIL、DIN
Remarks:  1,Above data is measured under ambient temperature is  25℃,  without specimen, and keep two hours constancy temperature.
2.Except the above specifications, all non-standard requirements can do according to customers special requirements.
3, Manufacturer has the right to change the above data without noticed.

2.1 Installation site conditions

Install this test chamber in a place which satisfied the following conditions

2.1.1 Ambient conditions
Ambient temperature rangeпјљ 5пЅћ35в„ѓпј›
Humidity range :           ≤85%RH
Atmospheric pressureпјљВ В В В  86пЅћ106KPaпј›
Air quality:    Haven’t high concentration dust and corrosive gas
Floor requirementsпјљВ В В  Flat, level floor with good ventilation
Space requirements
For the purpose of future easily ventilation, operation and maintaining, please install the test chamber according to below space requirements:
It needs space more than 800mm from 4 sides of test chamber.
It must have sufficient access space to ensure the door can be opened. Please do not put any objects on the front side of door, as the hot steam may damage the objects.

2.2В  Power supply

2.2.1В  Power supply
Check main power supply for the equipment (the diameters of electrical wire, power switch etc.) comply with below requirements:
Frequency and fluctuation: 50В±0.5Hzпј›

2.2.2В  Ground wire
Connect the test chamber to ground can avoid electric shock and reduce the noise caused by improper running.

2.2.3В  Connect power supply cable
Connect the mains power supply cable of test chamber to the external electricity power supply (Check the phase consequence, current, and power consumpation clearly before connection).

3.1 Does your factory has the ability to design according to different specifications?

Yes, we can design the walk in chamber which exactly meet your test requirements, including temperature and humidity, weathering etc.

3.2 В In order to get the chamber which meet my requirements, which kind of requirements I should pay attention to?

In order to design theВ walk inВ chamber which exact meet your requirements, please let us those requirements at least:

Internal dimension, or specimen dimensions, temperature range, humidity range, ramp rate (if applicable).

3.3 What’s the lead time?

Normally, for a walk in chamber,the lead time is 2 month after deposit received.

3.4В What’s kind of payment method you accepted?

In our factory, the payment term is T/T 30% downpayment before production, and T/T 70% before shipment. If different payment method required, please contact with our sales.

3.5 What’s kind of price term I can work with you?

We accept EXW, FOB Guangdong, CIF destination port.

Industial-oven-Structures
External: Double galvanized metal steel sheet, with spray-paint electrostatic processing surface
  • Internal: High quality stainless steel with mirror polishing
  • Insulation: Rigid polyurethane foam and glass fiber
  • Heater: Nickel chrome alloy

Safety-protection-devices

Test area Electrical control
-Adjustable build-in over temperature protection
-Additional over temperature protection
-over temperature limitation setup protection
-Blower over heat protection
-Phase sequence, phase lose protection
-Earth leakage protection
-Load short circuit protection

Related Products