Rain test chamber,IP test,IEC60529 enclosure protection degree test equipment, for IPX1, 2,3,4,5,6

Rain-chamber-IPX1,IPX2,IPX3,IPX4-1

Rain test chamber,IP test,IEC60529 enclosure protection degree test chamber, it can simulate rain, water spray, dripping water during storage, transit, or operation for IPX1,IPX2,IPX3,IPX4, IPX5,IPX6 testing. It is help to determine the effectiveness of protective covers, cases and seals etc. resistance ability respect to rain, water spray, or dripping water.

Internal capacity: 500L, 1000L

Model no.: L-CR series

Temperature range:RT+10℃ ~80℃

IPX1, IPX2, IPX3, IPX4, IPX5, IPX6 test apparatus available

Specifications for Rain test chamber,IP test,IEC60529 enclosure protection degree test

Model L-CR-500 L-CR-1000
Internal dimensionD*W*H 800*840*800 1000*1000*1000
External dimension D*W*H 800*1220*1800 1300*1500*2000
IPX1,IPX2 Water drop test device
Water sink Save energy according to the volume for chamber
Raining amount 1-5mm/min(±0.5mm/min)
Raining area Change according to the size of water sink.
Water dropping diameter Φ0.4mm (Φ0.8mm,Φ1.2mm optional)
Water dropping distance 25*25mm
Specimen rotation table Φ300mm (It can be done according to the size of specimen)
Angle for specimen table 150(Max), adjustable 150(Max),
Specimen  rotation table Rotarion table diameter is Φ300mm, the hight can be adjusted upper and lower (within 500mm) manually; Specimen table rotary speed:1~10/min, it is adjustable
Water supply pressure ≥0.1Mpa
Water sink It is installed on the top of chamber, the height for it is not adjustable
Controller Programmable touch screen controller
Main components Flow meter, filter, pressure gauge, pressure pump etc.
Internal material SUS304 Stainless steel with mirror polishing   SUS304
Main structure material SUS304 Stainless steel (All parts flow through water are made from stainless steel)
Viewing window/ Illumination With viewing window and lamp
Test hole Φ50mm, 1pc
Power supply Current leakage protector, phase leakage protector, water shortage protector
Powwer Different from different configuration.
Complied standards IEC60529,GB2423.38,GB4208.93,GB7000.1
Remarks: *1, The data measured under ambient temperature 25℃. Above data may be changed without notice.

2.1 Installation site conditions

Install this test chamber in a place which satisfied the following conditions

2.1.1 Ambient conditions
Ambient temperature range: 5~35℃;
Humidity range :           ≤85%RH
Atmospheric pressure:     86~106KPa;
Air quality:    Haven’t high concentration dust and corrosive gas
Floor requirements:    Flat, level floor with good ventilation
Space requirements
For the purpose of future easily ventilation, operation and maintaining, please install the test chamber according to below space requirements:
It needs space more than 800mm from 4 sides of test chamber.
It must have sufficient access space to ensure the door can be opened. Please do not put any objects on the front side of door, as the hot steam may damage the objects.

2.2  Power supply

2.2.1  Power supply
Check main power supply for the equipment (the diameters of electrical wire, power switch etc.) comply with below requirements:
Frequency and fluctuation: 50±0.5Hz;

2.2.2  Ground wire
Connect the test chamber to ground can avoid electric shock and reduce the noise caused by improper running.

2.2.3  Connect power supply cable
Connect the mains power supply cable of test chamber to the external electricity power supply (Check the phase consequence, current, and power consumpation clearly before connection).

3.1 Does your factory has the ability to design according to different specifications?

Yes, we can design the walk in chamber which exactly meet your test requirements, including temperature and humidity, weathering etc.

3.2  In order to get the chamber which meet my requirements, which kind of requirements I should pay attention to?

In order to design the walk in chamber which exact meet your requirements, please let us those requirements at least:

Internal dimension, or specimen dimensions, temperature range, humidity range, ramp rate (if applicable).

3.3 What’s the lead time?

Normally, for a walk in chamber,the lead time is 2 month after deposit received.

3.4 What’s kind of payment method you accepted?

In our factory, the payment term is T/T 30% downpayment before production, and T/T 70% before shipment. If different payment method required, please contact with our sales.

3.5 What’s kind of price term I can work with you?

We accept EXW, FOB Guangdong, CIF destination port.

Related Products