Dust test chamber,IP test,IEC60529 degree test equipment, for IP5, IP6

Dust-test-chamber-Weathering-simulation-chamber-small1

Dust test chamber,IP test,IEC60529 degree test equipment for IP5, IP6. It simulates the dust from the environment to test the enclosure anti-dust ability. It is applicable for function tests for cars, lightings, low-voltage electronic compliances, communication devices, instruments, household electronic compliances etc. It can comply with the test requirements for IP5,IP6.

Internal capacity:1000L

Model no.: L-DT series

Temperature range:RT+10℃ ~80℃

Controller:Single-point temperature controller, precise PID control

Unique structure and design, with good temperature uniformity

Specifications for Dust test chamber,IP test,IEC60529 degree test equipment, for IP5, IP6

Model L-DT-1000 L-DT-1500 L-DT-2000
Internal dimension
D*W*H (mm)
1000*1000*1000 1000*1500*1000 1200*1800*1200
External dimension
D*W*H (mm)
1100*1450*1950 1100*1950*2100 1300*2250*2200
Interior material SUS304 Stainless steel
Exterior material Galvanized steel plate
Viewing window There is a big viewing window on the door
Specimen power socket Dust-proof socket
Controller Programmable touch screen controller
a. Dust diffusing time (stop/diffusing) h/m/s is adjustable
b. Repeat interval: Adjustable
c.Pre-testing time:  Adjustable within in 9999H/M
d.Power on:  Turn on and off at interval of 15min (This time is adjustable)
Mesh dimension Hole diameter is 50um, distance between two holes is 75um.
Air blower Plastic centrifugal fan
Vacuum system Equipped with pressue gage, air filter, three pieces of pressure regulation, and connection tube (vacuum pum is optional, if it is needed, pls contact with our sales.
Standard accessories Power supply cable, 3 phase +N+E
Safety devices Power supply leakage breaker
Remark: Remark: 1,It complies with the standards such as GB2423、GB4706、GB4208、DIN, Degrees of protection provided by enclosure(IP code) for household appliances,low voltage appliances,automobile,motorcycle and component.
2, It unable to satisfy military standard: GJB150

2.1 Installation site conditions

Install this test chamber in a place which satisfied the following conditions

2.1.1 Ambient conditions
Ambient temperature rangeпјљ 5пЅћ35в„ѓпј›
Humidity range :           ≤85%RH
Atmospheric pressureпјљВ В В В  86пЅћ106KPaпј›
Air quality:    Haven’t high concentration dust and corrosive gas
Floor requirementsпјљВ В В  Flat, level floor with good ventilation
Space requirements
For the purpose of future easily ventilation, operation and maintaining, please install the test chamber according to below space requirements:
It needs space more than 800mm from 4 sides of test chamber.
It must have sufficient access space to ensure the door can be opened. Please do not put any objects on the front side of door, as the hot steam may damage the objects.

2.2В  Power supply

2.2.1В  Power supply
Check main power supply for the equipment (the diameters of electrical wire, power switch etc.) comply with below requirements:
Frequency and fluctuation: 50В±0.5Hzпј›

2.2.2В  Ground wire
Connect the test chamber to ground can avoid electric shock and reduce the noise caused by improper running.

2.2.3В  Connect power supply cable
Connect the mains power supply cable of test chamber to the external electricity power supply (Check the phase consequence, current, and power consumpation clearly before connection).

3.1 Does your factory has the ability to design according to different specifications?

Yes, we can design the walk in chamber which exactly meet your test requirements, including temperature and humidity, weathering etc.

3.2 В In order to get the chamber which meet my requirements, which kind of requirements I should pay attention to?

In order to design theВ walk inВ chamber which exact meet your requirements, please let us those requirements at least:

Internal dimension, or specimen dimensions, temperature range, humidity range, ramp rate (if applicable).

3.3 What’s the lead time?

Normally, for a walk in chamber,the lead time is 2 month after deposit received.

3.4В What’s kind of payment method you accepted?

In our factory, the payment term is T/T 30% downpayment before production, and T/T 70% before shipment. If different payment method required, please contact with our sales.

3.5 What’s kind of price term I can work with you?

We accept EXW, FOB Guangdong, CIF destination port.

Industial-oven-Structures
External: Double galvanized metal steel sheet, with spray-paint electrostatic processing surface
  • Internal: High quality stainless steel with mirror polishing
  • Insulation: Rigid polyurethane foam and glass fiber
  • Heater: Nickel chrome alloy

Safety-protection-devices

Test area Electrical control
-Adjustable build-in over temperature protection
-Additional over temperature protection
-over temperature limitation setup protection
-Blower over heat protection
-Phase sequence, phase lose protection
-Earth leakage protection
-Load short circuit protection

Related Products